Complete delivery on the upgrade of existing facilities for Statkraft Suldal Dam

- Servi has delivered good work with the project at Osvad, taking on challenges with ease. The end result has been very good, with a tidy installation and satisfactory function of the lifting mechanism
Helge Steinbru Lauvsnes, Statkraft Suldal dam

Due to wear and tear, it was time for an upgrade of the facility at the Suldal Dam hydroelectric power plant.

Servi, Sandnes department, received the entire contract, covering everything from product manufacturing to road closure and traffic control while the upgrade work was underway.

What did the assignment consist of?

  • Dismantling of old equipment
  • Cylinder for 3 gatehouses
  • Hydraulic Power Unit (HPU) with a control cabinet in each
  • Replaced bearings and bolts (with grease) in the dam gates
  • Assembly of new equipment

FACT

  • Industry: Hydropower
  • Owner: Statkraft
  • Delivery: Upgrade project on existing facilities with a combination of new cylinders, HPU, dismantling of old + assembly of new equipment.
  • When: 2022
  • Delivered by: Servi Group 

Need a service agreement?

Upgrading existing facilities extends the service life and makes the system both live longer and perform better.

From the assembly of the hydraulic unit and cylinder at the Suldal Dam hydroelectric power plant.

Our deliveries to hydro power

Servi has over 110 years of solid expertise in power and motion control. We help our customers think outside the box and deliver innovative and energy-efficient solutions.